INDUSTRIAL ENGINEERING FORMULAS, MORE THAN 150 IE FORMULAS - WITH THE COMPLETE DETAILS

 

INDUSTRIAL ENGINEERING FORMULAS

 More 150 useful formulas with clear details

1.       Second to minute conversion = Observed seconds / 60

2.       Decimal minute = 1 minutes /100 => 0.01 minutes,

3.       1 decimal minutes = 60seconds / 100 => 0.6 seconds  

4.       SMV to second conversion = SMV x 60

5.       Cycle Time = Start to end observed time of process

6.       Average Cycle time (ACT) = (CT1, CT2, CT3,… CTn)/n

7.       Basic minute = Observed Minute x Performance Rating

8.       Standard minute = (Observed Minute x Performance Rating) / Standard ratting  

9.       Performance Ratting = Observed minute / Standard minutes

10.   Off time = Loss time

11.   On time = Worked time

12.   Off time ratting = (Loss time / Available time) x 100

13.   On time ratting = (Available time - Loss time) / Available time x 100

14.   Loss time = Loss time

15.   Loss of man hours = Sum of Loss time

16.   Available minutes = (Work hours x 60 x Total Manpower)

17.   Bundle Handling minute = (Bundle Open Minute + Bundle tied minute) / Bundle Qty

18.   SMV = Observed time x Ratting x (1 + Machine Delay + Allowance) + BHT

19.   SMV produced = (SMV x Production)

20.   SAV per process = (SMV/ Total Process)

21.   SMV per garment = Sum SMV in all process 

22.   Estimated SMV = (SMV / Planned Worker Efficiency)

23.   Costing SMV = SMV x (1+ Allowance)

24.   Production Capacity = (Available minutes / Average Cycle minute)

25.   Production Capacity per operators per hour = (60 / Average Cycle minute)

26.   Production Capacity per operators per Day = (60 x Work hours per day) / Average Cycle minute

27.   Production Capacity per operators per Month = (60 x Work hour per day x Wok days) / Average Cycle minute

28.   Target = (Available Minute / SMV)

29.   Target per operators per hour = (60 / Process SMV)

30.   Target per operators per Day = (60 x Work hours per day) / Process SMV

31.   Target per operators per Month = (60 x Work hour per day x Wok days) / Process SMV

32.   Target per Line per Hour = (60 x Total Manpower) / Garment SMV

33.   Target per Line per Day = (60 x Work hours per day x Total Manpower) / Garment SMV

34.   Target per Line per Month = (60 x Work hour per day x Total Manpower x Wok days) / garment SMV

35.   Efficiency = (SMV Produced / Available Minutes) x 100

36.   Efficiency = [(SMV x Production) / Available Minutes] x 100

37.   Planned efficiency = (Planned output x SMV) / (Total Manpower x Working minutes) x 100

38.   Planned sewing Efficiency = (Planned output x Sewing SMV) / (Total Manpower x Working minutes) x 100

39.   Style Efficiency = [(SMV x Production) / (Total Manpower Used x Working minute per day)] x 100

40.   Cutting Section Efficiency = (Cutting SMV x Production) / (Manpower Used x Working minute) x 100

41.   Sewing Section = (Total Sewing SMV x Production / total available minute) x 100

42.   Finishing Section Efficiency = (Finishing SMV x Production)/ (Manpower Used x Working minute) x 100

43.   Embroidery section Efficiency = [(Embroidery SMV x Production) / (Available minutes x Manpower)] x 100

44.   Washing section Efficiency = [(Washing SMV x Production) / (Available minutes x Manpower)] x 100

45.   Printing section Efficiency = [(Printing SMV x Production) / (Available minutes x Manpower)] x 100

46.   Factory efficiency = (Over all SMV Produced / Overall minutes available) x 100

47.   Performance per operator (Hour, day, Month)

48.   Performance per line (Hour, day, Month)

49.   Machine Idle time = Time of not used

50.   Operators Idle time = Time of not worked

51.   Machine Utilization Rate = [(Available minute – Idle Minute) / Available minute] x 100

52.   Operator Utilization Rate = [(Available minute – Waiting Minute) / Available minute] x 100

53.   Man and machine ration = Total Manpower / total Machine Used  

54.   Machine Productivities => Pieces per machine = Total Production / Machine used

55.   Labor Productivity => Pieces per man = Total Production / Manpower used

56.   Input = No of piece loaded (Input)

57.   Output = total Garment transferred with Acceptable Quality  

58.   WIP = Total input – Total Output

59.   Cost per line = (Total cost per month / Working days / No of line running)

60.   Cost per man = (Total cost per month / Working days / No of line / No of Manpower Using)

61.   Cost per machine = (Total cost per month / Working days / No of line / No of Machine Running)

62.   Cost per minute = (Total cost per month / Working days / No of line / No of Machine / Work Minute )

63.   Cost per pieces (CM)= (SMV x Cost per minute) / Organization Efficiency

64.   Break Even cost pieces per line = (Total cost / CM)

65.   Break Even cost per line = (Total Cost / No of line)

66.   Break even efficiency per stye = [SMV / (CM / COST per minute)] x 100

67.   Actual time taken pe garment = Total Minutes Used / Production

68.   Actual cost per minute = (Target cost per minute / Efficiency)

69.   Actual cost per garments = (SMV x Target cost per minute) / Efficiency

70.   BPT = Total Minute / No of work station

71.   UCL = BPT / Planned Efficiency

72.   LCL = 2xBPT - UCL

73.   TT = Available time / Planned Out put

74.   Battle Neck process = Least capacity of the line

75.   Critical Process = Least capacity of the line and height defects rate 

76.   SPI = stitches per inch

77.   SPC = stitches per cm

78.   RPM = Revulsion per minute

79.   HSF (High Speed Factor) = [(4.5-MST)/100]+1

80.   Rate of Feed (ROF) = RPM / (SPC)

81.   MST = (SPC / RPM) x .0006 min

82.   MTM 100: TMU = 100000/3600 = 27.78s

83.   MTM 120: TMU = 120000/3600 = 33.36s

84.   Convert MTM 100, TMU to Basic Minute = TMUs / 1500

85.   Convert MTM 120, TMU to Basic Minute = TMUs / 2000

86.   Conversion TMV to basic minutes  

87.   Performance rating scale: BEDAUX = 60 to 80, MTM Low = 67, MTM high = 80  

88.   Performance rating scale: TAYLOR = 100 to 133, MTM Low = 111, MTM high = 133

89.   Performance rating scale: BSI = 75 to 100, MTM Low = 83, MTM high = 100

90.   Performance rating scale: MTM = 100 to 120, MTM Low = 100, MTM high = 120

91.   Manpower Balancing = (No of manpower used / No of manpower required) x 100

92.   Manpower required = [(SMV / Worker Efficiency) x Planned Output] / Working Minute

93.   Value Added Process =The process adding value to garment and customer willing to pay for that.

94.   Non-value-Added Process = The process not adding value to garment and customer not willing to pay for that.

95.   Employee Multi Skill = (Employee Knowing < 1 process)

96.   Skill Rate of employees = (Total Process Known / Total process) x 100

97.   Skill Rate of section = (Sum of Process Known in the section / Total process x manpower) x 100

98.   Skill Rate of factory = (Sum of Process Known in the factory / Total process x manpower) x 100

99.   Concurrent Multi Process Handling = Doing more that 1 process

100. Concurrent Multi Machine Handling = Operating more that 1 machine

101. Floater Operators = Partially working for some other process to balance

102. Jumper Operators = Moving each process to other process for balancing

103. Operator Repair rating = (Total Rework / Total produced) x 100

104. Operator Defect rate = (Total Defect / Total produced) x 100 

105. End line Defect Rate = Total Defects / Total Inspected x 100  

106. RFT = (Total Pcs sewn right at first time / Total Production ) x 100

107. DHU = (Total defect garment / total Garments) x 100

108.  Final Inspection Defect rate = (Defects found / Sample selected for inspection) x 100

109. OQL = (Total Defect found / Total order QTY) x 100 at final inspection

110. Thread consumption (m) = (Seam length x Frequency x Factor) 100 + Wastage

111. Thread Factor = Total opened thread length / Total seam length

112. Lace Consumption = (Consumed + Allowances) x 1+ Shrinkage

113. Elastic Consumption = (Consumed + Allowances) x 1+ Shrinkage

114. Absenteeism % = (Total absent/On Roll) x 100

115. Employees Attrition % = (Total employees left / Total on roll) x 100

116.Employees heiring rate = (Employees Heired / Total Employees) x 100

117.Employees training rate= (Employees trained / Total Employees) x 100

118. Employees learning curve time = Total No of days of training to achieve at 40% Efficiency

119.Over time rate % = (Over time / Working time)

120.Over time per head = (Total over time / Total Manpower used)

121.Total Monday used = Cumulative Working Minute of total manpower/ Working Minutes per day

122.Total machine shift used = Cumulative Working Minute of operators / Working Minutes per day

123.Average Production per day = Total production / Working Day

124.Average SMV per garment = total SMV Produced / SMV

125.CM produced = CM x Production

126.FOB produced = FOB x Production

127.Average FOB / Garments = Total FOB produced / Total Shippable QTY

128.Average CM per garments = Total CM produced / Total Shippable QTY

129.Average Shipping rate = Total Shipped Qty of the year / 12

130.Sales Value = Sum of FOB Produced (or) Total Shipped x Average FOB

131.Average Sales Value per month = Sum of FOB produced of the year / 12

132.Air Shipment Rate = Total Qty of Air Shipped / Total Qty Of Shipment x 100

133.Delay Shipment rate = Total Qty of Delay Shipped / Total Qty Of Shipment x 100

134.Replace panel rate = (Total Panel Replaced / Total QTY) x 100

135.Recutting Rate (full garments) = (Total Panel Recut / Total QTY) x 100

136.Finishing Rework Rate = (Total Finishing / Total QTY) x 100

137.OTP = (Total orders not shipped on time / Total order shipped) x 100

138.Order to cut ration = (Order / Cut QTY) x 100

139.Order to Ship ration = (Order / Shipped QTY) x 100

140.Cut to Ship ratio = (Shipped Qty / Cut QTY) x 100

141.Rejection rate = (Total Rejection / Cut Qty)

142.Dead stock rate = (Stock Available / Total Shipped) x 100

143.Remanent rate = Cut Qty – Shipped Qty    

144.Stock (Shippable) = (Total Produced – Total Shipped)

145.Marker Efficiency = (Area of patter / Area of Fabric) x 100

146.Ratio of IE = Total Machines / Total IEs  

147.Ratio of QC = Total Machines / Total QC

148.Ratio of Feeder = Total Machines / Total Feeder

149.Ratio of mechanic = Total Machines / Total Mechanic

150.Ratio of Utility = Total Machines / Total Utility

151.Ratio of Sweeper = Total Machines / Total Cleaner

152.Ratio of Helper = Total Machines / Total Helper

               153. Return of Investment Period in month = ( Cost invested / Cost-Benefit per month)

***


 

 


Comments

Popular posts from this blog

How to grade operators skill in the garment industries? For cutting, sewing and finishing section employees

A. Grading: Every employee is graded based on their actual skill known and actual performance. The grading process will be done by IE followed by the actual details of employees. Example: Process skill, Machine Skill, Actual performance, quality in their works, etc. the authenticated input is obtained from actual production report, skill matrix, and operators performance report. B. Type of grading: Grade A: Skilled operators Grade B: Semi-skilled operators Grade C: Basic Operators Grade D: beginner operators Grade E: None sewing process C. Grading wise process 1. SEWING SECTION: GRADE PROCESS MACHINES REMARKS A   1. Attach collar with band (Pick ready) 2. Attach Pocket (without mark) 3. Sleeve PLKT Diamond stitch 4. Sleeve Attached 5. Side seam Feed of Arm 6. Attach Cuff with pleat 7. Finish Round patch bottom (cut/sew) 8. Waist band close SNLS E/C SNLS / DNLS SNLS SNLC ...

How to make the best layout? What are the points that should be considered?

Introduction Garment manufacturing industries are following many types of layouts. In that, most of them are not efficient in all aspects. It is having some won merit and demerit. So, how could we make an efficient layout?   What are the basic points that should be considered? We will review one by one in below session. What is the right layout? Which layout is suitable to produce better efficiency is called right-layout . Simply arranging manpower, machines, furniture, material, etc. could not be the right layout. We have a few key things which should be considered during the layout design.    A. Work balance and workmanship distribution       Thump rule of layout design is workload balancing. Sewing lines is containing many processes. i.e. P1, P2, P3,…., Pn. All the process has to be balanced well. That should not be imbalanced between each and another process. For Example, P1 can produce 120 units, P2 can produce 50 pcs. In these cases, P2 is ...