1. OBJECTIVES:
Identify
and motivate the best performance employee and team, which may enable the employees
to work happily to achieve good quality and better efficiency.
2. SCOPE:
The
scheme is applicable to all core-production and supporting employees to
be a part of the healthy-competition.
3. PROCESS WONER:
Primary: Production Manager & IEP Manager
Secondary: HRD, CORE TEAM & MIS Audit
4. PROCESS INPUTS
Efficiency report
of the line
In-line
inspection, End line inspection and finishing rework due to sewing defects
reports of the line,
Attendance
report of the line,
Replace
Panel due to sewing section’s error,
Loading and
transfer ratio report of the line,
Work place
safety & Housekeeping of the line – Audit report from safety / HR officer.
5. PROCESS DECRIPTION
1. Provide
best performance award in every month
a) Best
line => (Supervisor +
Operator + Helper + Checker) ~ 45
b) Best
operators => Each line
2-person x 6 lines = 12 person
c) Best
Cutting operators =>
2-person
d) Best
Finishing operators =>
2-person,
e) Store
Fabric, Store accessories & Maintenance -
1-person, and
others.
f)
Total estimated person is around ~ 70
person
2. Initially we may arrange a start-up value items which
is 50 to 100 rupees per person. (Based on the efficiency we could add
slab-value on that). This also could be explained to them. (Here, we have to explain the employees, the
award is more valuable than its price).
a) Estimated cost/employees per month = 100 Rupees (~assumed)
b) Total person planned (max) = 70 person
c) Total
forecast value per month => 70 x Rs.100 = Rs. 7,000
5.1 Calculation to Identify the best performance line
The
authenticated reports will be collected from concern department by IED.
Example:
5.1.1. Efficiency report: It
is the primary information to identify the best performance line (BPL). The
highest efficiency produced line will be nominated to check below parameters.
The details will be considered from monthly report. The origin of reports is 1.
Finished garment transferred to finishing (or) washing from dispatch recorder,
2. Attendance (employees) report from HRD and 3. SMV details from IED. All the
input details will be verified by MIS-Audit to ensure the accuracy of the
details / data.
Calculation
method,
Efficiency = (Production X SMV) / (No
of employee x 480) x 100 --------------------- (a)
Criteria
for efficiency,
Efficiency > Other lines
---------------------------------------------------------------------------
(a’)
[‘.’ over time also will be considered
in the calculation]
Best operator will be considered from
individual efficiency report of the month which is calculated based on daily
work sheet details.
5.1.2. End line, In-line & finishing defects
due to sewing error reports: These three report
will be considered for secondary information. Which should be produced less
than 8% (collectively)
Calculation
method,
Defect rate = (Quantity Defect /
Quantity inspected) x 100 --------------------------- (b)
Criteria
for qualify,
Defect rate > 8% ----------------------------------------------------------------------------------
(b’)
Note:
Above 8% will be changed to 5% after 6 months from the implementation of
scheme. If any reject in final inspection due to sewing defects, then that the
line will be withheld to qualify.
[‘.’ The same will be followed in 1.
In-line inspection, 2. End line inspection and 3. Finishing section, the
average will be considered as overall defects rate]
5.1.3. Attendance report of the line: Employee
attendance report will be considered for additional information for individual
employees from the qualified line. The operators / employees who not absent
less than 2 days, they will be considered to nominate. Also will be considered
the reprimand of employees to nominate.
Calculation
method,
Employee absent = (No of day absent /
total working days) x 100 ------------------ (c)
Criteria
for attendance,
Individual-Employee absented days <
2days ---------------------------------------------- (c’)
[‘.’ The compensated absent days will
not be considered as absent, upon the authentication from HRD]
5.1.4. Replace Panel due to sewing
section’s error: The replace panel / re-cutting report
will be considered as additional information to qualification to receive the
award.
Calculation
method,
Re-cutting rate = (Total re-cut
quantity due to sewing defect / total input quantity) x 100 ----------- (d)
Criteria
for replace panel rate,
Re-cutting rate < 2 %------------------------------------------------------------------------------------------------------
(d’)
[‘.’ Re-cutting due to fabric and
cutting error will be exempted from consideration, unless the rate is less than
2.5%]
5.1.5. Loading and transfer ratio report
of the line: The output of the line will be
considered from finished and quality garment transferred from sewing section to
finishing (or) washing. If any process of sewing is not completed, then it will
not be considered. Except running order, all order loading and output will be
considered to qualify the line.
Calculation
method,
Loading and output ration = (Total
loading / total output) x 100 ------ (e)
Criteria
for loading to output ratio,
Loading and output ration = 0%------------------------------------------------
(e’)
[‘.’ If there is any acceptable reason
which is not due to sewing, then it will be considered for further reviewing of
qualify]
5.1.6. Work place safety &
Housekeeping of the line – Audit report from safety / HR officer:
The work place housekeeping and safety audit will be contacted by HRD
safety-officer. The safety of the employees and safety of the product will be
considered as additional information qualify the line.
i.e. Housekeeping in and around work
place, safety of work place, sharp material / tool control, needle policy,
hazard preventive maintenance, so on.
Calculation
method,
Audit score = 1-(Findings of abnormal
/ Total observation) x 100 ------------------------- (f)
Criteria
for work place safety and housekeeping,
Audit score = 80%---------------------------------------------------------------------------------------
(f’)
[‘.’ If there is any acceptable CAP raised
from the line against of finding, then it will be considered for further
reviewing of qualify]
5.2. Limit of the scheme
5.2.1. Calculation Period: The
calculation will be done in monthly basis. The time line is 1st date
of the month to last date of the month.
5.2.2. Best performance award issuing
time line: Every month 5th will be issued the
BPL award. The date will be fall next working day if any holiday or leave day.
5.2.3. Employee qualify for nomination: The
operators, helper, supporting employees, and checkers only will be considered
from the qualified line.
5.2.4. the rights of the scheme: The Core team and top management are authenticated to withheld the scheme at any times, if found any uncertainty or ineffective of the scheme.
5.3. Responsible
5.3.1. Responsible for calculation and prepare
report: The industrial Engineering department is
primary responsible to collect the authenticate details from origin of source. The
calculation will be done in monthly basis. The time line is 1st date
of the month to last date of the month. The details will be dually verified and
ensured its accuracy. The report will be generated and processed for necessary approval
from Production, HRD, MIS-Audit and the final approval from the Managing
Director. The approved report will be send to HRD & Accounts for further
process. The time line is 3-working days from last working days of the month.
5.3.2. The authentication of the scheme: The
HRD & MIS is authenticated to verify the details.
5.4. validity of the scheme
5.4.1. Validity: The
scheme is validity for 6-moths from the date of implemented.
5.5. Authority:
5.4.1. Authority to change, update or any
required action on the scheme: The primary responsible
to review, assess and provide updating points is liable to IED. The IED will be
observe closely the scheme execution, effective and other relevant details. The
details will be highlighted and bring to the core team review and discussion.
The outcome of core team discussion will be
carried to management with formal-proposal. The final authority of the
scheme 1. Update, 2. Change, 3. Re-design, etc. are liable to top management
and the Managing Directors.
6. PROCESS OUTPUT
Self-motivation to achieve efficiency, quality and systems.
7. PROCESS MEASURABLE
After 3-months, the overall improvement will be measured.
8. DOCUMENTS / RECORDS
Efficiency
report
Quality
Report
Attendance
report
Replace
Panel
Loading
report
Garment
transfer report
Housekeeping
and safety Audit report
Comments
Post a Comment
I hope the above details useful for you.
Share your topic to get articles.
Share it if useful to someone.